Wir haben über 70 Automatisierungsprojekte im Bergbau erfolgreich durchgeführt. Sie variieren in der Größe und einige von ihnen übertreffen sogar den Umfang der Automatisierung, indem sie die Installation von MV bis 35 kV und die Überwachung mechanischer Arbeiten vor Ort umfassen.
IM FOLGENDEN STELLEN WIR IHNEN EINIGE UNSERER GRÖßTEN PROJEKTE VOR

- State-of-the-art equipment and solution
- The first machine on site as an environmental improvement project
- Done within 24 months
- Maximum level of reliability and availability
- Operation and maintenance convenience
- Integration into supervising and control system for the ECS system and the whole opencast mine
Wir haben über 45 Automatisierungsprojekte in der Metallindustrie erfolgreich durchgeführt.
IM FOLGENDEN STELLEN WIR IHNEN EINIGE UNSERER GRÖßTEN PROJEKTE VOR

- State-of-the Art equipment and solution; the old machine was out of work for several years
- Increasing production capacity and product quality
- Maximum level of reliability and availability
- Operation and maintenance convenience
- The whole project is done within 6 months. It’s successful realization encourages customer to plan the modernization of the second casting machine.
Wir haben über 65 Automatisierungsprojekte im Energiebereich erfolgreich durchgeführt.
IM FOLGENDEN STELLEN WIR IHNEN EINIGE UNSERER GRÖßTEN PROJEKTE VOR
- Implemented DCS equipment and solution
- Maximum level of reliability and availability (24h / 7 days)
- Well-tuned process parameters
- Operation and maintenance convenience
- Project fully done within 6 months
- 29 motor-actuated and hydraulic-activated valves
- 17 frequency-driven pumps
- 28 process transmitters
- 15 regulating loops (standard and cascade PID implemented)
- 7 energy-calculating devices on fieldbus
Wir haben über 35 Automatisierungsprojekte in der Chemie- und Pharmaindustrie erfolgreich durchgeführt.
IM FOLGENDEN STELLEN WIR IHNEN EINIGE UNSERER GRÖßTEN PROJEKTE VOR
- Increase of production capacity
- improved safety
- better end-product quality
- maximum level of reliability and availability
- operation and maintenance convenience
- lower maintenance costs
Wir haben über 60 Automatisierungsprojekte in den Bereichen Wasser und Umwelt erfolgreich durchgeführt.
IM FOLGENDEN STELLEN WIR IHNEN EINIGE UNSERER GRÖßTEN PROJEKTE VOR
The Japanese government approved the donation to upgrade the supervisory control and data acquisition system (SCADA) for the Belgrade Water Supply System.
The scope of the project was to establish a SCADA system for control and monitoring of all wells, distribution pumping stations and reservoirs, reconstruction of the 7 main distributive pump stations and renewal of the equipment for water quality analysis.
Scope of Work
Mikro Kontrol provided detailed and As-built electrical designs, delivery and installation of the whole equipment, PLC and HMI software programming, electrical mounting on all sites, as well as commissioning.
The delivered equipment included:
- 14 server racks with belonging SCADA workstations
- 126 new PLCs as well as around 80 existing on which applicative adaptations were made in order to connect them to the system
- 25 touch operator panels
- 20 chlorine analyzers
- 26 L3 switches, 32 SHDSL routers and 149 GPRS routers
Benefits
- Maximum level of reliability and availability
- Increased energy efficiency
- State-of-the-art equipment and solution
- Operation and maintenance convenience
Technical Description
SCADA system covered 155 totally location:
- MCC - Main Control Center at 1 location
- LCC - Local Control Center at 4 locations
- Pumping stations of type A (with a local SCADA server) 14 locations
- Pumping stations of type B (without a local SCADA server) 14 locations
- Wells at 102 locations
- Reservoirs at 20 locations
The main functional tasks placed in front of the SCADA system included data acquisition, monitoring and real-time data archiving from all facilities connected to the system (around 10.000 tags), real-time control and monitoring of 102 wells and 7 main pump stations, as well as the real-time monitoring of all distributive pumping stations and reservoirs.
Wir haben über 120 Automatisierungsprojekte in der Lebensmittelindustrie erfolgreich durchgeführt.
IM FOLGENDEN STELLEN WIR IHNEN EINIGE UNSERER GRÖßTEN PROJEKTE VOR
- molasses storage and dilution
- Filtration
- Chromatography (Chromatographic Separation)
- Evaporation
- Clean – In - Place (CIP))
- Decentralized Control System equipment and solution
- Maximum level of reliability and availability 24h/ 7
- Reducing overall sugar production costs, better utilization of waste material
- Well-tuned process parameters
- Operation and maintenance convenience
- Done within 6 months
IM FOLGENDEN STELLEN WIR IHNEN EINIGE UNSERER GRÖßTEN PROJEKTE VOR

For production of high speed/capacity cardboard machines Mikro Kontrol delivered a highly demanding mechatronics application.
Scope of Work
Mikro Kontrol delivered detailed and As-built electric design, electrical cabinets, servo motors and sensors, PLC and HMI application, commissioning and testing.
Benefits
- Upgraded machine capacity and speed
- High precision of band cutting and stamping
- Easy to operate and working parameters setting-up
- Minimum risk for the operator
- Integration into end customer supervising system
Technical Description
The machine consists of several applicator heads for gluing and band stamping the cardboard boxes on the fly. Each band stamping head consists of two servo motors for adding and cutting the silicon tape that is applied over hot melt glue. Hot melt is applied by the previous applicator consisting of high speed nozzle. Position of each cardboard in the machine is tracked by encoder.
High-speed control system was developed using modern motion controller with EtherCAT communication. A speed of 25 000 pcs/hour is achieved. Control system also includes safety controller. Along with safety devices such as emergency stop buttons and light curtians, control system ensures minimum risk for working enviroment and operator.
Supported by the OPC UA, controller is integrated into the end customer supervising system. Using cloud services machine performance, monitoring by the end user is facilitated.
Wir haben viele Automatisierungsprojekte in anderen Branchen wie Kräne, Gummiindustrie, Mechatronik, Heizung, Lüftung, Klimatechnik
Mikro
Kontrol did a full reconstruction and modernization of two gantry cranes, capacity of 160/50t to support hydro-mechanical equipment in individual work as well as in coupled work.- Reliable work in both single and coupled mode
- No portal corruption
- The supervision and control of the load amount of each hook
- Safety circuit implemented
- Monitoring alarm system
- The speed limit in relation to the position and load management driving portal in terms of drive synchronization on both sides